The construction firm’s high performance remodeling work at the Glasswood building in southeast Portland wins ORA’s Commercial Interior and Commercial Specialty award categories.
When families in his community were losing their homes, a local pastor envisioned a way of bringing residents together to help their neighbors in need.
After a multi-punch assault on the USGBC’s LEED 2012 rating system, Rick Fedrrizzi, President of the USGBC, was forced to announce that LEED 2012 would not go to ballot as originally planned, would be renamed LEED V4, and would be delayed until June 2013.
What is the “Forer Effect” and why would you even care? We are all exposed to the Forer at some point in our life—some of us actually practice using it without even knowing it. The Forer Effect explains a lot about our society and predicts how people will likely react to a situation.