There is a lot of confusion in the field over area-separation firewalls and utility placement. I know that the GA has a position statement that clarifies criteria for the placement of utilities in the flanking walls on either side of a two-hour, steel H-stud, gypsum shaftliner panel area-separation wall.
Third-party contractor accreditation programs are required in specifications around the world. Special inspection agencies and their inspectors are required to demonstrate competence and relevant experience. This is demonstrated by passing a Firestop Exam.
RectorSeal continues to press forward on the acquisition trail. On Feb. 6, RectorSeal announced the acquisition of Dust Free indoor air quality products.
Specified Technologies announced that its SpecSeal LC Endothermic Firestop Sealant is now being offered in three colors: deep red, gray and white. Customers have been asking for both the white and gray for gypsum wallboard and concrete block spaces.
Batteries are increasingly being used in a vast array of applications, from consumer products and micromobility devices, known as e-bikes and e-scooters, to electric vehicles and utility-grade energy storage systems. As use of these devices has grown, so too has the number of fire incidents associated with them.
ClarkDietrich is giving framing contractors greater flexibility in leveraging the firestopping power of its BlazeFrame family of products with the introduction of BlazeFrame Tape.
3A Composites USA announced that its ALUCOBOND FaceFastened system successfully passed third-party NFPA 285 testing on a wood-framed assembly, which is commonly used in low-rise, multifamily and mixed-use market segments.
Specified Technologies announced the launch of its new corporate website. The new face of stifirestop.com is designed with customers in mind, increasing discoverability and ease of use while still empowering the core group of power-user customers.