Sammamish High School’s new campus replaces an existing one-story facility with a three-story, state-of-the-art educational facility spanning 320,000 square feet and serving nearly 1,000 students in grades 9-12.
The new device features a built in smoke sealing system that automatically adjusts to the amount of cables installed, allowing one to easily add or remove cables without the need to remove or reinstall caulking materials.
DriftTrak Headed Stud saves the time of installing DriftTrak after the slab has been poured by integrating it directly into the slab before its poured.
ARDEX Americas and ARCOM are pleased to announce that ARDEX product data and customized specifications are available through ARCOM’s software platforms to architects, engineers and design professionals.