Over the years, the installation of MEP equipment within a wall cavity, backing installed over the face of framing members for the installation of cabinets or other heavy devices, hard-base trim and granite countertops and backsplashes, have created problems for finishing gypsum panels.
Stockton Products is excited to announce its newest facility and has signed a lease on a 55,000 square foot building in the 4700 block of West Van Buren Street with easy access to I-10 and the 202 Loop South.
With 60-foot-high ceilings and soaring glass façades that fill the space with light, LaGuardia Airport’s massive new Terminal B completely transforms the travel experience.
FacadesXi announced that its new, state-of-the-art production facility is fully operational and is now capable of producing its full line of EIFS, Stucco, Water Barrier Coatings, and Specialty Coatings.
Spending on most categories of nonresidential and multifamily construction declined from February to March as contractors struggled to find enough workers and get timely deliveries of materials, according to an analysis the AGC released regarding federal spending data.
In the past, when French lace textures or heavy grit sand finishes were popular, preparing the brown coat was a matter of rodding a wall, knocking off the clinkers and curing the heck out of the plaster.