Founded in 1969, Eldersburg currently services the Baltimore, Washington D.C. and Hagerstown, Md., metropolitan and surrounding areas with four locations.
Founded in 1969, Eldersburg currently services the Baltimore, Washington D.C. and Hagerstown, Md., metropolitan and surrounding areas with four locations.
Passing through the entry of the Burj Khalifa tower in Dubai, U.A.E.—currently the world’s tallest building—one encounters a complex, double-curved wood ceiling floating overhead that approaches the complexity of the tower that hosts it.
A multiple phase production of commercial and residential units has one contractor utilizing construction software equipment for efficient project management.
Loudoun Station is a multiple phase development of 46 acres in Ashburn, Va., located along the new Silver Line Metro expansion serving the Dulles International Airport.
Traveling to the north edge of Michigan State University’s campus, one will find a river that flows through it, the Red Cedar, and then later run by the street that divides the historic campus from downtown East Lansing, Grand River Ave.
During a two year period WeKanDo Construction had the opportunity to work on a remodel of a 1919 design by the internationally acclaimed architect Whitney Warren, the ultra luxury Condado Vanderbilt Hotel.
No stranger to Walls & Ceilings readers—and the wall and ceiling community to boot—Heartland Acoustics & Interiors has been pioneering the Western U.S. frontier now for more than 15 years.
Two continuing education programs are available from Chicago Metallic: "Designing with Metal Ceilings" and "Seismic Requirements for Suspended Ceiling Systems."